Tuesday, March 2, 2010

Urgent~~~ IEM registration!!!


Brothers, do you all register as member of IEM already???

Havent??!!

if still havent must move fast lo~~
Don't be like tortoise anymore~~~ >.<
If not you will regret later...

How to Register??

Hehe, relax... ;)
I'll help you up~~~ ^^
1.) What you need to do now is just click on the link below and download the registration form.


2.) Read the instruction carefully and then fill up the form completely and correctly. (Just ask a friend to double check the form you had completely filled. That is because of people always cant realise the mistake they did.)

3.) After that, you need to go to post office and thus post it out.

THAT'S ALL!!! ^^
VERY EASY RIGHT??? hehe.... ^o^

And for sure, if you wanna know more about what is IEM, you may click on the link below. This website will shows you all the information about IEM that you wanna know.....\^c^/



Good Luck, Friends~~~

>c< Funny and dont think others~~~ XD

Nice video, have fun on it~~~ ^^
p/s: dont think too much and too far~~~ XD


What you think before the window is totally clean???
Hahahaha~~` XD

Information Systems (IS)? (>.<)

Why Use Information Systems?
Automating: doing things faster
i.)Technology is used to automate a manual process
Doing things faster, better, cheaper
Greater accuracy and consistency
ii.)Loan application example
Manual processing
Technology-supported process
Completely automated

Organizational learning: doing things better
i.)Going beyond automation
Involves learning to improve the day-to-day activities within the process
Looking at patterns and trends
ii.)Organizational Learning
Using acquired knowledge and insights to improve organizational behavior
iii.)Total Quality Management (TQM)
Monitoring an organization to improve quality of operations, products, and services

Supporting Strategy: doing things smarter
i.)Strategic Planning
1.Create a vision: setting the direction
2.Create a standard: performance targets
3.Create a strategy: reaching the goal

Project’s Life Cycle…



R3l@x~~~~

Does the gal rotate clockwise or anticlockwise???
Hehe..... Amazing~~~~

Tuesday, February 23, 2010

FYP o FYP ~~ ^o^

TOPIC: FEA of corrugated beam-to-column joints



What is FEA?


FEA consists of a computer model of a material or design that is stressed and analyzed for specific results. It is used in new product design, and existing product refinement. A company is able to verify a proposed design will be able to perform to the client's specifications prior to manufacturing or construction. Modifying an existing product or structure is utilized to qualify the product or structure for a new service condition. In case of structural failure, FEA may be used to help determine the design modifications to meet the new condition.

There are generally two types of analysis that are used in industry: 2-D modeling, and 3-D modeling. While 2-D modeling conserves simplicity and allows the analysis to be run on a relatively normal computer, it tends to yield less accurate results. 3-D modeling, however, produces more accurate results while sacrificing the ability to run on all but the fastest computers effectively. Within each of these modeling schemes, the programmer can insert numerous algorithms (functions) which may make the system behave linearly or non-linearly. Linear systems are far less complex and generally do not take into account plastic deformation. Non-linear systems do account for plastic deformation, and many also are capable of testing a material all the way to fracture.




Beam-to-column Joints



Therefore, I will do research and study on how the corrugated beam-to-column joints behave.

Good Luck to M3~~ ^c^

Stress ~~ (>.<)

So many works need to be complete within this week.... Stress~~~~~ >.<
This morning just reach the "HEAVEN" university, but my heart still "stick" on the chinese new year mood.... DIE~~~ x_x
And the worst is I still have many works havent complete and all must submit within this week... HOW???
Anyone come and save me from the hell?????
Wuwuwuwu...... :'(